How do I compare a declared simultaneous equipment draw with an owner-supplied operating cap?
This is booking arithmetic only. The site’s qualified operator supplies and approves the load limits, circuit arrangements and simultaneous draw.
Open Workshop power budgetTry the worked example
These are the example inputs from Workshop power budget. Replace them in the tool to run your own case.
| Owner-approved cap (kW) | Existing simultaneous draw (kW) | Requested workstations (stations) | Declared draw per station (kW) | Reserve to keep (kW) |
|---|---|---|---|---|
| 9.5 | 4.2 | 3 | 1.4 | 1 |
Example result
Booking headroom · 0.1 kW
Who uses this?
Workshop booking coordinator. The free online tool runs the calculation in your browser. To edit the files and use the tools offline in one business, see the €49 offline edition.
Where the idea came from
The episode considers workspace and facilities for local trades. This independent application adapts that idea to compare a declared simultaneous equipment draw with an owner-supplied operating cap.
Original video